Skip to content

ToolsUptime calculator

How much downtime does your target allow?

Enter an uptime target to see the allowed downtime for every period length, or enter downtime to get the percentage. The link reproduces the result.

Calculator

Target to downtime

%

Up to 6 decimal places.

Allowed downtime = period × (100 − target) / 100. Every figure is exact to the millisecond and rounded down, never up: rounding up would allow more downtime than the target does.

Allowed downtime at 99.9% in a 30-day month

43 min 12 s

Each square is one hour of a 30-day month (days across, hours down). allowed downtime, about 43 minutes
Allowed downtime at 99.9%
Day1 min 26.4 s1.44 min
Week10 min 4.8 s10.08 min
Month (28 days)February40 min 19.2 s40.32 min
Month (29 days)February in a leap year41 min 45.6 s41.76 min
Month (30 days)April, June, September, November43 min 12 s43.2 min
Month (31 days)The other seven months44 min 38.4 s44.64 min
Quarter (90 days)Q1 in a common year2 h 9 min 36 s129.6 min
Quarter (91 days)Q1 in a leap year, and Q22 h 11 min 2.4 s131.04 min
Quarter (92 days)Q3 and Q42 h 12 min 28.8 s132.48 min
Year (365 days)A common year8 h 45 min 36 s525.6 min
Year (366 days)A leap year8 h 47 min 2.4 s527.04 min

Downtime to availability

Availability = (period − downtime) / period × 100, truncated to 6 decimals so a missed target never reads as met.

Availability over a month (30 days)

99.895833%

45 min of downtime in 30 days. Truncated to 6 decimals.

Method

How it is calculated.

Formula

Allowed downtime = period × (100 − target) / 100

Computed in whole milliseconds with exact integer arithmetic, then rounded down. A figure marked rounded down was not a whole millisecond; rounding up would promise more downtime than the target allows.

Months

28, 29, 30 and 31 days

Calendar months differ by up to three days, so each length is shown instead of an average. A 99.9% target allows 40 min 19.2 s in February and 44 min 38.4 s in a 31-day month.

Quarters

90, 91 and 92 days

Q1 has 90 days in a common year and 91 in a leap year, Q2 has 91, Q3 and Q4 have 92. Check which quarter your contract measures.

Years

365 days, or 366 in a leap year

A leap year adds a day of measured time and so a day's share of allowed downtime (86.4 s more at 99.9%).

Reverse

Availability = (period − downtime) / period × 100

Truncated to six decimals, never rounded up, so a missed target never reads as met. This is the same display rule Observer uses for SLA attainment.

Clock time

Elapsed time, not wall-clock time

A day is 24 hours of elapsed time. A period that spans a daylight saving change has an hour more or less on the wall clock, which some contracts count differently.

Connect one metric. See its record in ten minutes.